The New Zealand ADS-B system
Introduction
Installation requirements
Rules & consultations
Operational requirements
Tips and tricks
ADS-B Grant scheme
News
Don't get left in the hangar
What you need to know on ADS-B
1. An introduction to ADS-B
2. Installation requirements
4. Operational requirements
3. Rules and consultations
5. Tips and tricks
6. ADS-B Grant scheme
Be equipped with ADS-B OUT
by 31 December 2022
Countdown to ADS-B in all controlled airspace. This is the confirmed deadline. The clock is ticking and the ‘shops’ are filling.
Catch up on the latest news and updates
Read more